Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Tyler Lobb. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.”

 


 
 

Thesis Proposal

The main objective of this thesis redesign is to decrease the building's energy consumption while still upholding the design criteria established by Reese Engineering. This is going to be accomplished, hopefully, by utilizing a geothermal or ground source heat pump system. The system will be analyzed on a number of issues, including; initial cost, construction time and cost, energy savings, maintenance, and indoor environmental quality.

THESIS PROPOSAL FULL REPORT (pdf)

THESIS PROPOSAL EXECUTIVE SUMMARY (pdf)

 

Electrical Breadth Topic

The building's electrical systems will be analyzed due to the introduction of a new mechanical system. The mechanical system could alter the sizing of electrical equipment and therefore needs to be considered in design.

Construction Managment Breadth Topic

The construction of a geothermal well site can be costly and time consuming and can sometimes inflate the project's budget and schedule. This will be examined to ensure the system is advantageous.